Hare Mill Pond Dam Reservoir Report

Last Updated: December 5, 2025

Hare Mill Pond Dam, located in North Carolina's Alleghany County, stands as a significant structure with a structural height of 17 feet.


°F

°F

mph

Wind

%

Humidity

Summary

This Federal-owned dam on the Tr-Big Pine Creek serves a primary purpose that falls under the "Other" category. While not regulated by the state, the dam is inspected regularly to ensure its satisfactory condition, reflecting a commitment to maintaining its integrity.

Despite lacking specific details on storage capacity, drainage area, and completion year, Hare Mill Pond Dam presents a notable hazard potential, emphasizing the importance of effective risk management measures. With its location in a picturesque natural setting, the dam's presence contributes to the environmental and ecological balance of the area. As an Earth-type dam, it showcases a blend of functionality and natural aesthetics, making it a noteworthy site for water resource and climate enthusiasts to appreciate.

The dam's ownership by a Federal agency adds a layer of complexity to its management and operation, warranting a strategic approach to emergency preparedness and risk assessment. With its proximity to the Wilmington District and under the congressional representation of Virginia Foxx, Hare Mill Pond Dam serves as a crucial component of the region's infrastructure. The dam's history, purpose, and structural design make it a compelling subject for further exploration and study in the context of water resource management and climate resilience.

River Or Stream

Tr-Big Pine Creek

Primary Dam Type

Earth

Structural Height

17

Hazard Potential

Significant

Nid Height

17
       
Seasonal Comparison

Weather Forecast

Dam Data Reference

Condition Assessment

Satisfactory
No existing or potential dam safety deficiencies are recognized. Acceptable performance is expected under all loading conditions (static, hydrologic, seismic) in accordance with the minimum applicable state or federal regulatory criteria or tolerable risk guidelines.
Fair
No existing dam safety deficiencies are recognized for normal operating conditions. Rare or extreme hydrologic and/or seismic events may result in a dam safety deficiency. Risk may be in the range to take further action. Note: Rare or extreme event is defined by the regulatory agency based on their minimum
Poor A dam safety deficiency is recognized for normal operating conditions which may realistically occur. Remedial action is necessary. POOR may also be used when uncertainties exist as to critical analysis parameters which identify a potential dam safety deficiency. Investigations and studies are necessary.
Unsatisfactory
A dam safety deficiency is recognized that requires immediate or emergency remedial action for problem resolution.
Not Rated
The dam has not been inspected, is not under state or federal jurisdiction, or has been inspected but, for whatever reason, has not been rated.
Not Available
Dams for which the condition assessment is restricted to approved government users.

Hazard Potential Classification

High
Dams assigned the high hazard potential classification are those where failure or mis-operation will probably cause loss of human life.
Significant
Dams assigned the significant hazard potential classification are those dams where failure or mis-operation results in no probable loss of human life but can cause economic loss, environment damage, disruption of lifeline facilities, or impact other concerns. Significant hazard potential classification dams are often located in predominantly rural or agricultural areas but could be in areas with population and significant infrastructure.
Low
Dams assigned the low hazard potential classification are those where failure or mis-operation results in no probable loss of human life and low economic and/or environmental losses. Losses are principally limited to the owner's property.
Undetermined
Dams for which a downstream hazard potential has not been designated or is not provided.
Not Available
Dams for which the downstream hazard potential is restricted to approved government users.