Levi Recreational Pond Dam Reservoir Report

Last Updated: December 8, 2025

The Levi Recreational Pond Dam in Steuben, New York, is a state-regulated earth dam completed in 1969 for recreational purposes.


°F

°F

mph

Wind

%

Humidity

Summary

With a height of 12 feet and a length of 285 feet, the dam provides a storage capacity of 50 acre-feet, with a normal storage level of 35 acre-feet. The dam is located on the TR-Tioga River, managed by the New York State Department of Environmental Conservation.

Despite its low hazard potential, the Levi Recreational Pond Dam has a moderate risk rating due to its age and lack of recent condition assessments. The dam features an uncontrolled spillway and has a maximum discharge capacity of 118 cubic feet per second. The surrounding area covers approximately 19 acres, with a drainage area of 0.23 square miles. While the dam has not been inspected since 2009, it remains operational and maintains a moderate risk management approach.

For water resource and climate enthusiasts, the Levi Recreational Pond Dam in Erwins, New York, is an intriguing structure to study. With its focus on recreation and its unique design features, such as the uncontrolled spillway, this dam offers insights into the management of water resources in the region. The moderate risk rating also presents an opportunity to assess the potential challenges and opportunities for improving the dam's safety and performance in the future.

Year Completed

1969

Dam Length

285

Dam Height

12

River Or Stream

TR-TIOGA RIVER

Primary Dam Type

Earth

Surface Area

19

Drainage Area

0.23

Nid Storage

50

Hazard Potential

Low

Nid Height

12
       
Seasonal Comparison

Weather Forecast

Dam Data Reference

Condition Assessment

Satisfactory
No existing or potential dam safety deficiencies are recognized. Acceptable performance is expected under all loading conditions (static, hydrologic, seismic) in accordance with the minimum applicable state or federal regulatory criteria or tolerable risk guidelines.
Fair
No existing dam safety deficiencies are recognized for normal operating conditions. Rare or extreme hydrologic and/or seismic events may result in a dam safety deficiency. Risk may be in the range to take further action. Note: Rare or extreme event is defined by the regulatory agency based on their minimum
Poor A dam safety deficiency is recognized for normal operating conditions which may realistically occur. Remedial action is necessary. POOR may also be used when uncertainties exist as to critical analysis parameters which identify a potential dam safety deficiency. Investigations and studies are necessary.
Unsatisfactory
A dam safety deficiency is recognized that requires immediate or emergency remedial action for problem resolution.
Not Rated
The dam has not been inspected, is not under state or federal jurisdiction, or has been inspected but, for whatever reason, has not been rated.
Not Available
Dams for which the condition assessment is restricted to approved government users.

Hazard Potential Classification

High
Dams assigned the high hazard potential classification are those where failure or mis-operation will probably cause loss of human life.
Significant
Dams assigned the significant hazard potential classification are those dams where failure or mis-operation results in no probable loss of human life but can cause economic loss, environment damage, disruption of lifeline facilities, or impact other concerns. Significant hazard potential classification dams are often located in predominantly rural or agricultural areas but could be in areas with population and significant infrastructure.
Low
Dams assigned the low hazard potential classification are those where failure or mis-operation results in no probable loss of human life and low economic and/or environmental losses. Losses are principally limited to the owner's property.
Undetermined
Dams for which a downstream hazard potential has not been designated or is not provided.
Not Available
Dams for which the downstream hazard potential is restricted to approved government users.