Jessup Prison Dam, located in Anne Arundel, Maryland, is a state-regulated earth dam built in 1982 with a primary purpose of recreation.
Wind
Humidity
Standing at a height of 31 feet and stretching 760 feet in length, this dam has a maximum storage capacity of 75 acre-feet and a normal storage level of 20 acre-feet. With a surface area of 4.5 acres and a drainage area of 0.6 square miles, Jessup Prison Dam plays a crucial role in managing water resources in the region.
Despite being classified as having a significant hazard potential, the dam is currently assessed to be in fair condition. Inspected by the Maryland Dam Safety agency, Jessup Prison Dam has a spillway width of 10 feet and an uncontrolled spillway type. The dam's risk assessment is moderate, with emergency action plans in place and a comprehensive inspection frequency of once every year. As a key component in the local water infrastructure, Jessup Prison Dam serves as a vital resource for both water conservation and recreational activities in the area.
Year Completed |
1982 |
Dam Length |
760 |
Dam Height |
31 |
River Or Stream |
Dorsey Run-TR |
Primary Dam Type |
Earth |
Surface Area |
4.5 |
Drainage Area |
0.6 |
Nid Storage |
75 |
Hazard Potential |
Significant |
Foundations |
Soil |
Nid Height |
31 |