Windspeed
Humidity
Refish #2 is a privately owned earth dam located on Big Branch in Decatur, Tennessee. Built in 1969, the dam stands at a hydraulic height of 13.5 feet and a structural height of 16.4 feet, with a length of 415 feet and a storage capacity of 109 acre-feet. The dam serves a primary purpose not specified, and its spillway type is categorized as uncontrolled.
Despite being classified as having a low hazard potential, Refish #2 poses a moderate risk level, with a condition assessment that is currently not rated. The dam has not been inspected since October 2017, with an inspection frequency of 5 years. Emergency action plans and risk management measures are not specified, highlighting potential gaps in preparedness and response capabilities in the event of a dam failure. Climate and water resource enthusiasts may find interest in exploring the intricacies of this structure and the implications of its risk assessment on surrounding communities and ecosystems.
Year_Completed | 1969 |
River_Or_Stream | BIG BRANCH |
Dam_Length | 415 |
Primary_Dam_Type | Earth |
Surface_Area | 13 |
Hydraulic_Height | 13.5 |
Drainage_Area | 0.33 |
Nid_Storage | 109 |
Structural_Height | 16.4 |
Outlet_Gates | None |
Hazard_Potential | Low |
Nid_Height | 16 |
SALT FORK NEAR ST. JOSEPH | 59cfs |
KASKASKIA RIVER AT CHESTERVILLE | 436cfs |
BONEYARD CREEK AT LINCOLN AVE AT URBANA | 3cfs |
VERMILION RIVER NEAR DANVILLE | 532cfs |
EMBARRAS RIVER NEAR CAMARGO | 105cfs |
WEST OKAW RIVER NEAR LOVINGTON | 103cfs |
LAKE FORK AT ATWOOD | 80cfs |