Miry Branch Dam, located in Johnston, North Carolina, is a privately owned earth dam designed for flood risk reduction.
Wind
Humidity
Standing at a structural height of 20.5 feet with a hydraulic height of 19 feet, the dam plays a crucial role in managing water flow in the area. With a normal storage capacity of 23 acre-feet and a maximum storage of 27 acre-feet, the dam covers a surface area of 3.2 acres and serves a drainage area of 12 square miles.
Despite its fair condition assessment as of December 2020, Miry Branch Dam is classified as having a high hazard potential. The dam is regulated by the North Carolina Department of Environmental Quality's Dam Safety Program, ensuring regular inspections and enforcement of safety standards. The last inspection took place in December 2020, with an inspection frequency of every two years to ensure the dam's integrity and functionality.
Enthusiasts of water resources and climate adaptation will find Miry Branch Dam to be a valuable asset in flood risk management within the region. Its strategic location and design contribute to the overall resilience of the area's water infrastructure. By understanding the dam's specifications and regulatory framework, stakeholders can appreciate the importance of maintaining and monitoring such critical infrastructure to mitigate potential hazards and ensure community safety.
Dam Length |
625 |
Primary Dam Type |
Earth |
Surface Area |
3.2 |
Hydraulic Height |
19 |
Drainage Area |
12 |
Nid Storage |
27 |
Structural Height |
20.5 |
Hazard Potential |
High |
Nid Height |
21 |