SNOFLO



GUNNISON IRRIGATION - SEDIMENT POND 2

RESERVOIR LEVELS

March 31, 2025


°F

°F

mph

Windspeed

%

Humidity

Gunnison Irrigation - Sediment Pond 2, located in Gunnison, Utah, is a privately owned earth dam that was completed in 2012. Designed by Jones & Demille Engineering, Inc., this dam stands at a structural height of 35 feet with a hydraulic height of 31 feet. It has a storage capacity of 112 acre-feet, with a normal storage level of 80 acre-feet.

Managed by the Utah Division of Water Rights, this sediment pond plays a crucial role in regulating water flow and sediment deposition in the area. With a spillway width of 65 feet and a maximum discharge rate of 4 cubic feet per second, this dam has a significant hazard potential. Despite not being rated for its condition, regular inspections are conducted to ensure its safety and functionality. The last inspection took place on June 30, 2020, with a frequency of every 2 years.

As a key component of the local water resource management system, Gunnison Irrigation - Sediment Pond 2 serves an essential purpose in maintaining water quality and regulating sediment levels. Its strategic location in the Sanpete County, Utah, contributes to the overall water sustainability efforts in the region. With its construction, oversight, and maintenance falling under state jurisdiction, this dam demonstrates a collaborative effort between private ownership and state regulatory agencies to ensure the efficient management of water resources in the area.

Year_Completed 2012
Dam_Length 2200
Primary_Dam_Type Earth
Hydraulic_Height 31
Nid_Storage 112
Structural_Height 35
Hazard_Potential Significant
Nid_Height 35
       



       

Weather Forecast