R.N. Industries - Wonsit Disposal Ponds Reservoir Report

Last Updated: December 5, 2025

R.N.


°F

°F

mph

Wind

%

Humidity

Summary

Industries - Wonsit Disposal Ponds, located in Uintah, Utah, is a privately owned water resource facility regulated by the Utah Division of Water Rights. The disposal ponds, primarily used for industrial purposes, have a low hazard potential and a hydraulic height of 10 feet. With a storage capacity of 57.2 acre-feet, the facility serves as an essential component in managing water resources in the region.

Despite its modest size and low hazard potential, the Wonsit Disposal Ponds play a crucial role in the local water management infrastructure. The facility is subject to regular state inspections, ensuring compliance with regulatory standards and maintaining the safety of surrounding communities. With a focus on responsible water resource management, R.N. Industries upholds its commitment to environmental stewardship through proper maintenance and operation of the ponds.

Located within the jurisdiction of the Utah Division of Water Rights, R.N. Industries - Wonsit Disposal Ponds serves as a model for private sector involvement in sustainable water resource management. With a state-regulated status and a history of compliance, the facility exemplifies the importance of private ownership in maintaining water quality and availability in Utah. As climate enthusiasts and water resource advocates, we recognize the significance of facilities like Wonsit in ensuring the long-term sustainability of our water supply.

Primary Dam Type

Earth

Hydraulic Height

10

Nid Storage

57.2

Hazard Potential

Low

Nid Height

10
       
Seasonal Comparison

Weather Forecast

Dam Data Reference

Condition Assessment

Satisfactory
No existing or potential dam safety deficiencies are recognized. Acceptable performance is expected under all loading conditions (static, hydrologic, seismic) in accordance with the minimum applicable state or federal regulatory criteria or tolerable risk guidelines.
Fair
No existing dam safety deficiencies are recognized for normal operating conditions. Rare or extreme hydrologic and/or seismic events may result in a dam safety deficiency. Risk may be in the range to take further action. Note: Rare or extreme event is defined by the regulatory agency based on their minimum
Poor A dam safety deficiency is recognized for normal operating conditions which may realistically occur. Remedial action is necessary. POOR may also be used when uncertainties exist as to critical analysis parameters which identify a potential dam safety deficiency. Investigations and studies are necessary.
Unsatisfactory
A dam safety deficiency is recognized that requires immediate or emergency remedial action for problem resolution.
Not Rated
The dam has not been inspected, is not under state or federal jurisdiction, or has been inspected but, for whatever reason, has not been rated.
Not Available
Dams for which the condition assessment is restricted to approved government users.

Hazard Potential Classification

High
Dams assigned the high hazard potential classification are those where failure or mis-operation will probably cause loss of human life.
Significant
Dams assigned the significant hazard potential classification are those dams where failure or mis-operation results in no probable loss of human life but can cause economic loss, environment damage, disruption of lifeline facilities, or impact other concerns. Significant hazard potential classification dams are often located in predominantly rural or agricultural areas but could be in areas with population and significant infrastructure.
Low
Dams assigned the low hazard potential classification are those where failure or mis-operation results in no probable loss of human life and low economic and/or environmental losses. Losses are principally limited to the owner's property.
Undetermined
Dams for which a downstream hazard potential has not been designated or is not provided.
Not Available
Dams for which the downstream hazard potential is restricted to approved government users.