Fresh Water Impoundment Reservoir Report

Last Updated: December 15, 2025

Fresh Water Impoundment, also known as Fresh Water Pond, is a private water storage facility located in Kern County, California.


°F

°F

mph

Wind

%

Humidity

Summary

This Earth dam structure stands at a height of 15 feet and has a length of 100 feet, with a storage capacity of 18 acre-feet. While the dam is not state-regulated, it is under the jurisdiction of the Mine Safety and Health Administration, with inspections and enforcement handled by the same agency.

The primary purpose of Fresh Water Impoundment is for water supply, making it a valuable resource for the local community in Taft FCI. With a hazard potential classified as high, the condition assessment of the dam is currently not available, indicating a need for further evaluation and monitoring. Despite not having a completed risk assessment or emergency action plan, the facility serves an essential role in providing water resources in the region.

As a key infrastructure for water management, Fresh Water Impoundment highlights the intersection of water resources and climate considerations. With its significant storage capacity and private ownership, the facility plays a crucial role in supporting water supply needs in a region vulnerable to climate variability. However, the lack of complete regulatory oversight and condition assessment points to the importance of ongoing monitoring and risk management efforts to ensure the safety and reliability of this water resource infrastructure.

Dam Length

100

Dam Height

15

Primary Dam Type

Earth

Nid Storage

18

Hazard Potential

High

Nid Height

15
       
Seasonal Comparison

Weather Forecast

Dam Data Reference

Condition Assessment

Satisfactory
No existing or potential dam safety deficiencies are recognized. Acceptable performance is expected under all loading conditions (static, hydrologic, seismic) in accordance with the minimum applicable state or federal regulatory criteria or tolerable risk guidelines.
Fair
No existing dam safety deficiencies are recognized for normal operating conditions. Rare or extreme hydrologic and/or seismic events may result in a dam safety deficiency. Risk may be in the range to take further action. Note: Rare or extreme event is defined by the regulatory agency based on their minimum
Poor A dam safety deficiency is recognized for normal operating conditions which may realistically occur. Remedial action is necessary. POOR may also be used when uncertainties exist as to critical analysis parameters which identify a potential dam safety deficiency. Investigations and studies are necessary.
Unsatisfactory
A dam safety deficiency is recognized that requires immediate or emergency remedial action for problem resolution.
Not Rated
The dam has not been inspected, is not under state or federal jurisdiction, or has been inspected but, for whatever reason, has not been rated.
Not Available
Dams for which the condition assessment is restricted to approved government users.

Hazard Potential Classification

High
Dams assigned the high hazard potential classification are those where failure or mis-operation will probably cause loss of human life.
Significant
Dams assigned the significant hazard potential classification are those dams where failure or mis-operation results in no probable loss of human life but can cause economic loss, environment damage, disruption of lifeline facilities, or impact other concerns. Significant hazard potential classification dams are often located in predominantly rural or agricultural areas but could be in areas with population and significant infrastructure.
Low
Dams assigned the low hazard potential classification are those where failure or mis-operation results in no probable loss of human life and low economic and/or environmental losses. Losses are principally limited to the owner's property.
Undetermined
Dams for which a downstream hazard potential has not been designated or is not provided.
Not Available
Dams for which the downstream hazard potential is restricted to approved government users.